Reorder Paragraphs · Part 2: Reading

Rail Profile

261 students marked "I sat this"Added 20 Mar 2020Question #100008

Put the paragraphs in order.

  1. AHowever, the long-term expense involved in frequent maintenance outweighed any savings.
  2. BThe first steel rails were made in 1857 by Robert Forester Mushet, who laid them at Derby station in England. Steel is a much stronger material, which steadily replaced iron for use on railway rail and allowed much longer lengths of rails to be rolled.
  3. CThese rails were too fragile to carry heavy loads, but because the initial construction cost was less, this method was sometimes used to quickly build an inexpensive rail line.
  4. DThese were superseded by cast iron rails that were flanged and with the wagon wheels flat.
  5. EAn early proponent of this design was Benjamin Outram. His partner William Jessop preferred the use of "edge rails" in 1789 where the wheels were flanged and, over time, it was realised that this combination worked better.
  6. FEarly rails were used on horse drawn wagon way, originally with wooden rails, but from the 1760s using strap-iron rails, which consisted of thin strips of cast iron fixed onto wooden rails.
Practise this question with AI scoringAll 292 Reorder Paragraphs questions

Opens question #100008 in the RealPTE practice screen.

More Reorder Paragraphs questions

Reorder Paragraphs format (Pearson)

Pearson's name: Reorder Paragraph

PromptText up to 110 words
Time to answerNot set per question (Part 2 lasts 23–30 minutes)
Skills assessedReading

How it is scored

  • Partial credit applies: a partly correct response still scores.

Source: Pearson, PTE Academic & UKVI test format, Part 2: Reading, checked 9 October 2026.